HYKSOS

Precise construction estimating & takeoffs.

Trade takeoffs, full-construction BOQs and construction cost estimates for subcontractors, builders and developers. Formwork, tiling, or the whole build.

A process built for tender week.

01. Brief & drawings

Send drawings, specs and schedules. We confirm scope, timeline and commercial sensitivity.

02. Quantification

A measured takeoff from your drawings, every quantity traceable to a marked-up PDF.

03. Marked-up drawings & workbook

Quantities set out trade by trade in a BOQ or estimate workbook.

04. Delivery & assumptions

Marked-up drawings, the workbook and an assumptions and exclusions register land in your inbox.

Projects and clients

Project types

Clients we work with

Work that speaks for itself.

Civil tenders, full-construction takeoffs and formwork bills, measured the same way whatever the trade.

3 Mary Street & 41 Auburn Road, Auburn

Residential Tower · 27 levels · Formwork Takeoff

Raked slab edges, cantilevered balconies and perimeter retaining walls, measured zone by zone.

Supermarket site and roundabout, Tahmoor

Civil Tender BOQ · 4 levels · Civil, Structure and Services

A 197-bay car park, a new roundabout, stormwater by pipe size and 24 tilt-panel elevations, billed in the tender's four packages.

Dual occupancy with two pools, Caringbah South

Detailed Construction Estimate · 2 levels · 21 Trade Sections, Priced

Two mirrored dwellings on bored piers with timber first floors on steel beams and a pool behind each, priced trade by trade.

Call 0421 125 249  Request a quote